Budweiser Tours
HOME Tour Information Events Gift Shop Brewing Process Sampling Sign Up Contact Us
Finishing
 

Cooling TanksFILTERING

After the Lagering process, the beer is chilled, stabilized, and filtered. Following the chillproofing, the beer is stored in settling tanks at 32° for 2 days to complete settling. It is then given a final filtering.

 

TASTING

At each step in the process, the beer is tasted by a Brewmaster to ensure consistency and drinkability. After the final filtration, the beer is held in a filtered beer tank for a final quality control check and Brewmaster tasting. Now the beer is ready to be packaged.